You can make a difference |
Posted: 11 Oct 2010 07:17 AM PDT I remember back to early 2005 (before going for my post graduation), when I'd just started preparing for some competitive examination, that even though I had great ambitions, my knowledge, expertise, and confidence as a student was sorely lacking. My love for internet (as a source of information) made me stumble through various places on the web to know maths short cuts and quick maths tricks, but without much to gain from it. Now, after having being there and facing it all as a student first and then as a facilitator (though I take good number of Quants classes for CAT aspirants, I would not liked to be called a tutor or a teacher. These titles should be reserved for people of great wisdom and learning) for over 4-5 years I felt I had a really good grip on things; and even then, there were many things I am still struggling with. Now with the help of QuickerMaths.com, I want to create a platform, easily accessible to the student fraternity where they can get what they are looking for; at least things related to Quantitative Aptitude, Logical Reasoning, Analytical Reasoning and Critical Reasoning - a platform where you can ask questions and where you can give answers.
Let The Process Begin
You can stay in touch with what QuickerMaths.com is up to through our email subscription method. Also feel free to connect with me on Twitter, Facebook and LinkedIn.
Time and Work FormulaI think the single most useful formula for the topic work and Time ? N1H1D1E1W2 = N2H2D2E2W1 Where: N1 and N2 = number of person H1 and H2 = Hours worked by per person per day (assumed constant) D1 and D2 = days E1 and E2 = Efficiency W1 and W2= Amount of work done Consider this example to understand the applicability of this formula – A piece of work can be done by 16 men in 8 days working 12 hours a day.How many men are needed to complete another work, which is three times the first one,in 24 days working 8 hours a day. The efficiency of the second group is half that of the first group? Solution – N1H1D1E1W2 = N2H2D2E2W1 16*12*8*1*3 = N2*8*24*0.5*1 N2 = (16*12*8*1*3)/ (8*24*0.5*1) = 48 So number of men required is 48. Note – you can remove anything from formula is not given in the question. For example if the question would have been – "A piece of work can be done by 16 men in 8 days working 12 hours a day.How many men are needed to complete another work, which is three times the first one,in 24 days working 8 hours a day." The applicable formula would have been – N1H1D1W2 = N2H2D2W1 Since nothing is mentioned about efficiency, we remove it from both sides. Related posts: |
You are subscribed to email updates from Quicker Maths To stop receiving these emails, you may unsubscribe now. | Email delivery powered by Google |
Google Inc., 20 West Kinzie, Chicago IL USA 60610 |
No comments:
Post a Comment